Power Systems Bonding is done at the both ends of the cable to reduce the sheath loss iron loss copper loss None of these sheath loss iron loss copper loss None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Efficiency of thermal power plant can be taken as product of efficiencies of all stages. turbine efficiency. efficiency of thermal cycle. generator efficiency. product of efficiencies of all stages. turbine efficiency. efficiency of thermal cycle. generator efficiency. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Graphite is use din nuclear plant as a / an moderator. fuel. coolant. electrode. moderator. fuel. coolant. electrode. ANSWER DOWNLOAD EXAMIANS APP
Power Systems More efficient plants are used as both 1 and 2 None of these base load plant peak load plant both 1 and 2 None of these base load plant peak load plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity? 750 MW 500 MW 1250 MW 250 MW 750 MW 500 MW 1250 MW 250 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a line is increased by which of the following compensation methods? shunt reactor both 1 and 2 shunt capacitor series capacitor shunt reactor both 1 and 2 shunt capacitor series capacitor ANSWER DOWNLOAD EXAMIANS APP