Power Systems Where do compounding done in thermal power plants Turbine. Coal handling plant. Ash handling plant. Generator. Turbine. Coal handling plant. Ash handling plant. Generator. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows: IR1 = j1.5 pu, IR2 = -j0.5 pu, IR0 = -j1. The type of fault is LLG LLL LG LL LLG LLL LG LL ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has self and mutual impedances are 0.8 and 0 pu respectively. Find the positive, negative and zero sequence impedances respectively? 0.6, 0.6 and 0.6 pu 0.8, 0.8 and 0.8 pu 0.6, 0.6 and 1.2 pu 0.6, 0.8 and 1.2 pu 0.6, 0.6 and 0.6 pu 0.8, 0.8 and 0.8 pu 0.6, 0.6 and 1.2 pu 0.6, 0.8 and 1.2 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Specified quantities of slack bus are V and δ P and Q P and δ P and V V and δ P and Q P and δ P and V ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following material is not used as fuse element? Carbon. Copper. Aluminium. Silver. Carbon. Copper. Aluminium. Silver. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the methods of laying underground cables? Direct laying. None of these. Draw - in - system / duct - pipe laying. Both A and B. Direct laying. None of these. Draw - in - system / duct - pipe laying. Both A and B. ANSWER DOWNLOAD EXAMIANS APP