MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Talcher Super Thermal Power Station
Vindhyachal Thermal Power Station
Mundra Thermal Power Station
Sasan Ultra Mega Power Plant

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Consider the following statements and choose the correct option:
Statement 1: The magnitude of earth fault current for a given fault position within a winding depends upon the method of neutral grounding.
Statement 2: Earth fault protection for an electric motor is provided by means of instantaneous overcurrent relay.

Both Statement 1 and Statement 2 are TRUE
Both Statement 1 and Statement 2 are FALSE
Statement 1 is TRUE and Statement 2 is FALSE
Statement 1 is FALSE and Statement 2 is TRUE

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Replace the underlined phrase in braket grammatically and conceptually with the help of the given options. If the given sentence is correct then select the option 'The given sentence is correct'.

The new client had to pay money to initiates a account and activate their service

have to pay money to initiate an
The given sentence is correct
had to pay money to initiate an
had to pay money to initiate a

ANSWER DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
In a single phase energy meter, the series electromagnet is energized by a ___ of ___

current coil, thick wire of few turns
current coil, thin wire of more turns
voltage coil, thin wire of more turns
voltage coil, thick wire of few turns

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP