MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Mundra Thermal Power Station
Sasan Ultra Mega Power Plant
Talcher Super Thermal Power Station
Vindhyachal Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
In a 3-phase, 4-wire, 400/230 V system, a lamp (L1) of 100 W is connected to one phase and neutral and a lamp (L2) of 150 W is connected to the second pahse and neutral. If the neutral wire is disconnected accidently, what will be the voltage across a 100 W lamp (L1)?

160 V
180V
120V
240V

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Case 1: The PV connected to the DC bus was injecting 20 kW of power constituting of 1 kW of loss
Case 2: The same PV is connected to the AC bus constituting to 1.5 kW loss. Find out the change in efficiency from Case 1 to Case 2?

2.5% increase
5% decrease
5% increase
2.5% decrease

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP