MGVCL Exam Paper (30-07-2021 Shift 1)
A transformer designed for operation at 60 Hz supply is working at 50 Hz supply system without changing its voltage and current ratings. Compared to the full load efficiency at 60 Hz, the full load transformer efficiency at 50 Hz.
For small turbine starts generating power 12.6 kph (3.5 m/s) is the typical cut-in speed. At 36–54 kph (10–15 m/s) produces maximum generation power. At 90 kph (25 m/s) maximum, the turbine is stopped or braked.