MGVCL Exam Paper (30-07-2021 Shift 1)
A transformer designed for operation at 60 Hz supply is working at 50 Hz supply system without changing its voltage and current ratings. Compared to the full load efficiency at 60 Hz, the full load transformer efficiency at 50 Hz.
Tank - Name of power station - capacity 1 - Vindhyachal Thermal Power Station - 4,760MW. 2 - Mundra Thermal Power Station - 4620 MW 3 - The Sasan Ultra Mega power plant - 3960 MW 4 - The Tiroda thermal power plant - 3300 MW