Power Systems Electrostatic precipitators in thermal power plants are used for All of these removal of ash from flue gas control flow rate remove moisture from the cole All of these removal of ash from flue gas control flow rate remove moisture from the cole ANSWER DOWNLOAD EXAMIANS APP
Power Systems Telecommunication lines are transposed to reduce the efficiency All of these voltage level radio interference in communication lines efficiency All of these voltage level radio interference in communication lines ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of per unit system is/are Need of transformation ratio No units for any quantity All of these It has units for all quantities Need of transformation ratio No units for any quantity All of these It has units for all quantities ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 12 MW 10 MW 5 MW 6 MW 12 MW 10 MW 5 MW 6 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the methods of laying underground cables? Both A and B. Draw - in - system / duct - pipe laying. None of these. Direct laying. Both A and B. Draw - in - system / duct - pipe laying. None of these. Direct laying. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a two plant system, the load is connected to plant number 2. The loss coefficients are B11,B12 are non zero ,B22 = 0 B11,B22,B12 are non zeros B11 is non zero,B22 = B12 = 0 B11,B22 are non zero,B12 = 0 B11,B12 are non zero ,B22 = 0 B11,B22,B12 are non zeros B11 is non zero,B22 = B12 = 0 B11,B22 are non zero,B12 = 0 ANSWER DOWNLOAD EXAMIANS APP