Building Construction To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as Header Bat Closer Stretcher Header Bat Closer Stretcher ANSWER DOWNLOAD EXAMIANS APP
Building Construction The line of intersection of the surfaces of a sloping roof forming an external angle exceeding 180°, is None of these Hip Ridge Valley None of these Hip Ridge Valley ANSWER DOWNLOAD EXAMIANS APP
Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 30° 60° 90° 0° 30° 60° 90° 0° ANSWER DOWNLOAD EXAMIANS APP
Building Construction Stability of an existing structure may be disturbed by Mining in the neighborhood Vibrations caused by traffic movements All listed here Rising of water table Mining in the neighborhood Vibrations caused by traffic movements All listed here Rising of water table ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of excavation of foundations, is generally measured with a Levelling staff Ranging rod Boning rod Steel tape Levelling staff Ranging rod Boning rod Steel tape ANSWER DOWNLOAD EXAMIANS APP