MGVCL Exam Paper (30-07-2021 Shift 2)
A three-phase, 12 kV, 50 Hz and 300 kW load is operating at 0.8 pf lag. If the pf is to be improved to unity, using star connected capacitor, the per phase value of the reactive VAR required is:
Buchholz relay is gas operated relay. It will operate when internal fault occurs in transformer. It is placed between tank to main conservator. It has two contacts trip and alarm. Use of Buchholz relay in distribution transformer is not economical.