MGVCL Exam Paper (30-07-2021 Shift 1)
A grid interactive solar system:

always receives power from the grid
always supplies power to the grid
works only when the grid fails
supplies power to as well as receives power from the grid as required

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Murray loop test is performed on a faulty cable 300 m long. At balance, the resistance connected to the faulty core was set at 15 Ω and the resistance of the resistor connected to the sound core was 45 Ω. Calculate the distance of the fault point from the test end.

450 m
150 m
75 m
225 m

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
In a 3-phase, 4-wire, 400/230 V system, a lamp (L1) of 100 W is connected to one phase and neutral and a lamp (L2) of 150 W is connected to the second pahse and neutral. If the neutral wire is disconnected accidently, what will be the voltage across a 100 W lamp (L1)?

120V
180V
160 V
240V

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP