MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Mundra Thermal Power Station
Talcher Super Thermal Power Station
Sasan Ultra Mega Power Plant
Vindhyachal Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Replace the underlined phrase in braket grammatically and conceptually with the help of the given options. If the given sentence is correct then select the option 'The given sentence is correct'.

The new client had to pay money to initiates a account and activate their service

had to pay money to initiate a
The given sentence is correct
have to pay money to initiate an
had to pay money to initiate an

ANSWER DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Determine maximum permissible load which a 15 MVA, ONAN cooled transformer to IS : 2026 can take for 6 hr, if the initial load on it was 12 MVA. The weighted ambient temperature is 20˚C. Assume the permissible load kVA as a fraction of rated kVA is 1.25.

18.75 MVA
12 MVA
9.6 MVA
15 MVA

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP