MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Talcher Super Thermal Power Station
Sasan Ultra Mega Power Plant
Mundra Thermal Power Station
Vindhyachal Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A given solar cell has the following specifications: Isc = 4 A and Voc = 0.7 V. Consider that 20 identical cells with the above specifications are to be interconnected to create a PV module. What is the open-circuit voltage of the PV module if all the solar cells are connected in a series configuration?

14 V
0.7 V
11.2 V
12.6 V

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A THHN conductor will have 75°C termination on one end and a 60/75°C termination on the other, which ampacity column will be used?

None of these
75°C column
90°C column
60°C column

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Simultaneous tripping of the circuit breaker at both ends of a transmission line is achieved by

distance protection
none of these
pilot protection
overcurrent protection

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Determine maximum permissible load which a 15 MVA, ONAN cooled transformer to IS : 2026 can take for 6 hr, if the initial load on it was 12 MVA. The weighted ambient temperature is 20˚C. Assume the permissible load kVA as a fraction of rated kVA is 1.25.

18.75 MVA
12 MVA
9.6 MVA
15 MVA

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP