GETCO Exam Paper (22-07-2015) Who was the political Guru of Netaji? Lokmanya Tilak Gokhle Sardar Patel R. Das Lokmanya Tilak Gokhle Sardar Patel R. Das ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) "Overshoot" in a time response of control systems is indication of final value of the output none of this measure of relative stability steady state solution final value of the output none of this measure of relative stability steady state solution ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? none of these Base load solar power plant Peak load none of these Base load solar power plant Peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents average load of the system energy generated in the period considered base load of the system Maximum demand of the power station average load of the system energy generated in the period considered base load of the system Maximum demand of the power station ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Normally the angle of the transmission line is kept _____ because of _____ reasons 45, steady state stability 90, steady state stability 45, transient stability 90, transient stability 45, steady state stability 90, steady state stability 45, transient stability 90, transient stability ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) 100% string efficiency means One of the insulator discs shorted None uniform potential distribution across each disc Equal potential across each disc Zero potential across each disc One of the insulator discs shorted None uniform potential distribution across each disc Equal potential across each disc Zero potential across each disc ANSWER DOWNLOAD EXAMIANS APP