GETCO Exam Paper (22-07-2015)

GETCO Exam Paper (22-07-2015)
The breaking capacity of a CB is usually expressed interms of

MVA
MW
amperes
volts

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Fast excitation system of the generator will _____

Improve the dynamic stability
Improve the power factor
Improve the voltage control
Improve the reactive power control

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
The constraints that are to be met with while solving UC problem are

Minimum up time
all are correct
Minimum down time
Spinning reserve

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Merz-Price protection is employed for protection of

motor
circuit breaker
alternators
transmission lines

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Penalty factor in power system economical operation is measure of

Line loss
all are correct
generation cost
fuel cost

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Which power plant may take several days to start up and shunt down?

Base load
solar power plant
none of these
Peak load

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (22-07-2015)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑