GETCO Exam Paper (22-07-2015) Fast excitation system of the generator will _____ Improve the reactive power control Improve the voltage control Improve the power factor Improve the dynamic stability Improve the reactive power control Improve the voltage control Improve the power factor Improve the dynamic stability ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The national song of India was composed by Rabindranath Tagore Iqbal Bankim Chandra Chatterji Jai Shankar Prasad Rabindranath Tagore Iqbal Bankim Chandra Chatterji Jai Shankar Prasad ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The value of holding ratio of relay is always Infinite less than 1 greater than 1 zero Infinite less than 1 greater than 1 zero ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The steady state stability of the power systems is most effected by transmission line reactance stability of generator voltage at generator bus power factor of the load transmission line reactance stability of generator voltage at generator bus power factor of the load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Shunt capacitors in a substation consume active power consumes lagging VAR deliver active power delivers lagging VAR consume active power consumes lagging VAR deliver active power delivers lagging VAR ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Two watt meter method for 3 phase circuit is preferred over other methods because it can be used for star or delta connected load it can be used for balanced or unbalanced load PF of the load can also be estimated all are correct it can be used for star or delta connected load it can be used for balanced or unbalanced load PF of the load can also be estimated all are correct ANSWER DOWNLOAD EXAMIANS APP