GETCO Exam Paper (22-07-2015) Fast excitation system of the generator will _____ Improve the voltage control Improve the dynamic stability Improve the power factor Improve the reactive power control Improve the voltage control Improve the dynamic stability Improve the power factor Improve the reactive power control ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In a power system network, at which bus the shunt is connected that can be known from Y bus of the system reactive power demand none of these type of bus Y bus of the system reactive power demand none of these type of bus ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In G-S method of power flow problem, the number of iterations _____ depends on voltage control buses remains fixed depends on no of buses depends on tolerance depends on voltage control buses remains fixed depends on no of buses depends on tolerance ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In case of a balanced three phase sinusoidal AC supply, because of the phase difference rotating magnetic field is produced neutral current is high if load is not balanced all are correct neutral wire is not required, if load is balanced rotating magnetic field is produced neutral current is high if load is not balanced all are correct neutral wire is not required, if load is balanced ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Who is the 2012 London Olympics bronze medalist in badminton? Ashwini Ponnappa Saina Sania Jwala Gutta Ashwini Ponnappa Saina Sania Jwala Gutta ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Jyotigram Yojana is pertaining to Supplying 100% reliable power for street light of villages Developing agricultural land Supplying 100% reliable power to villages Supplying resedential and other power separately Supplying 100% reliable power for street light of villages Developing agricultural land Supplying 100% reliable power to villages Supplying resedential and other power separately ANSWER DOWNLOAD EXAMIANS APP