MGVCL Exam Paper (30-07-2021 Shift 1)
Which type of connection is employed for current transformers for the protection of delta- star connected 3-phase transformer?

star-delta
star-star
delta-star
delta-delta

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Murray loop test is performed on a faulty cable 300 m long. At balance, the resistance connected to the faulty core was set at 15 Ω and the resistance of the resistor connected to the sound core was 45 Ω. Calculate the distance of the fault point from the test end.

225 m
150 m
450 m
75 m

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Case 1: The PV connected to the DC bus was injecting 20 kW of power constituting of 1 kW of loss
Case 2: The same PV is connected to the AC bus constituting to 1.5 kW loss. Find out the change in efficiency from Case 1 to Case 2?

2.5% increase
5% decrease
5% increase
2.5% decrease

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
In a single phase energy meter, the series electromagnet is energized by a ___ of ___

voltage coil, thin wire of more turns
current coil, thin wire of more turns
current coil, thick wire of few turns
voltage coil, thick wire of few turns

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP