MGVCL Exam Paper (30-07-2021 Shift 2)
Which one of the following statement with respect to Aerial Bunched Cables (ABC) system is TRUE?

The overall cost of the ABC system is very high as compared to the bare conductor system.
ABC system is not suitable for rural electrification which are situated in difficult terrain, hills, forests and coastal areas.
ABC system totally eliminates the fault on lines and thereby improving the quality of supply.
ABC system requires more clearance, insulators and high maintenance.

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
The miniature circuit breaker (MCB) with Class D trip characteristics trips instantaneously when the current flowing through it reaches ____ the rated current.

between 10 to 20 times
between 5 to 10 times
between 2 to 3 times
between 3 to 5 times

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
The necessary equation to be solved during the load flow analysis using Fast-Decoupled method is given below:
where B' and B'' are formed using the imaginary part of the bus admittance matrix, Ybus. If the system consists of 6 buses of which one of the bus is slack bus and 2 bues are voltage regulated buses, then then the matrix B' is of order ____and the matrix B'' is of order____, respectivity.
∆P/|Vi| = - B'∆δ
∆Q/|Vi| = - B''∆|V|

3 and 5
6 and 3
3 and 6
5 and 3

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
A generating station having 'n' section busbars each rated at Q kVA with ×% reactance is connected on the tie-bars systems through busbar reactances of b%. Determine the short circuit kVA if a 3-phase fault takes place on one section.

Q[(1/x) - (n+1)/(bn-x)]
Q[(1/x) + (n+1)/(bn-x)]
Q[(1/x) + (n+1)/(bn+x)]
Q[(1/x) + (n-1)/(bn+x)]

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP