System Analysis and Design Which of the following is the most critical requirement of a Passenger Reservation System? printing of tickets response time None of these graphical user Interface ease of programming printing of tickets response time None of these graphical user Interface ease of programming ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design In Data structure, main characteristic of "ring" is : All of these many records point to one record None of these first record points only to the last record last, record points to the first record All of these many records point to one record None of these first record points only to the last record last, record points to the first record ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Data manipulation language (DML) specifies for the DBMS what is required; the techniques used to process data describes how data are structured in the data base all of the listed here determine how data must be structured to produce the user's view specifies for the DBMS what is required; the techniques used to process data describes how data are structured in the data base all of the listed here determine how data must be structured to produce the user's view ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design During the implementation phase, the executive vice-president is primarily concerned with directing None of these controlling organizing planning directing None of these controlling organizing planning ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The systems have been classified in different ways All of these None of these physical or abstract man-made information system open or closed All of these None of these physical or abstract man-made information system open or closed ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is not a factor in the failure of the systems developments projects? inadequate user involvement continuation of a project that should have been cancelled failure of systems integration size of the company inadequate user involvement continuation of a project that should have been cancelled failure of systems integration size of the company ANSWER DOWNLOAD EXAMIANS APP