System Analysis and Design Which of the following is a graphic representation of the modules in the System and the interconnection between them Structural chart Pie chart System chart Flow chart Structural chart Pie chart System chart Flow chart ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Top Management is more interested in Both of the listed here tactical decision strategic decisions None of the listed here Both of the listed here tactical decision strategic decisions None of the listed here ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The person communicating with the manager to identify information needs is the executive vice-president programmer None of these system analyst vice- president of information system executive vice-president programmer None of these system analyst vice- president of information system ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The black box concept is based on the assumption(s) that; None of these the suprasystem is stable All of these black boxes are dependent or environments the relationship between the inputs and output is stable None of these the suprasystem is stable All of these black boxes are dependent or environments the relationship between the inputs and output is stable ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Conversion method in which users, being used to an old system, continue to use the old system, along with the new system, is Multitasking All of these Multiprocessing None of these Parallel run Multitasking All of these Multiprocessing None of these Parallel run ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The feasibilities studied in preliminary investigation is (are): All of these technical feasibility operational feasibility economic feasibility None of these All of these technical feasibility operational feasibility economic feasibility None of these ANSWER DOWNLOAD EXAMIANS APP