System Analysis and Design The person communicating with the manager to identify information needs is the vice- president of information system None of these executive vice-president system analyst programmer vice- president of information system None of these executive vice-president system analyst programmer ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Back-up procedure helps in all of the listed here restoring the data files whenever there is a system crash none of the listed here restoring the operation whenever there is a disk failure all of the listed here restoring the data files whenever there is a system crash none of the listed here restoring the operation whenever there is a disk failure ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design In Decision trees the branch depends on the condition and decisions to made nodes represent the conditions, with the right side of tree listing the actions to be taken the root is drawn on the left and is the starting point on the decision sequence. All of these None of these the branch depends on the condition and decisions to made nodes represent the conditions, with the right side of tree listing the actions to be taken the root is drawn on the left and is the starting point on the decision sequence. All of these None of these ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The term scheme means two dimensional table a map of overall structure of a database. a parent with no owners the relationship service bureau None of these two dimensional table a map of overall structure of a database. a parent with no owners the relationship service bureau None of these ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The instruction "If it's raining outside, then take an umbrella to work" is an example of the _____ structure, Sequence Repetition Selection Switching Control Sequence Repetition Selection Switching Control ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is not a factor in the failure of the systems developments projects? inadequate user involvement continuation of a project that should have been cancelled failure of systems integration size of the company inadequate user involvement continuation of a project that should have been cancelled failure of systems integration size of the company ANSWER DOWNLOAD EXAMIANS APP