System Analysis and Design
The model base cannot be prepared until

the computer has been selected
both (a) and (b)
the MIS staff has been acquired and organized
the preparation of physical facilities
None of these

ANSWER DOWNLOAD EXAMIANS APP

System Analysis and Design
Which of the following is not true of the conversion phase of the development life cycle?

the non machine components of the system should be considered
steps must be taken to phase out the old system
the user and systems personnel must work closely together
documentation should be emphasized

ANSWER DOWNLOAD EXAMIANS APP