System Analysis and Design _____ use standardized symbols to represent an algorithm. Flowcharts Pseudocode Pseudocharts IPO charts Flow diagrams Flowcharts Pseudocode Pseudocharts IPO charts Flow diagrams ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design On-line data entry is most suitable in the case of entering monthly journal entries Processing payment of cheque in a bank All of these updating payroll master None of these entering monthly journal entries Processing payment of cheque in a bank All of these updating payroll master None of these ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design A checksum digit is used for detecting Errors in None of these All of these Data transmission Arithmetic operations Logical operations None of these All of these Data transmission Arithmetic operations Logical operations ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design The longest method of conversion is parallel None of these direct phased pilot parallel None of these direct phased pilot ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design An open rectangle represents a process that transforms incoming data flow(s) into outgoing data flows None of these identifies data flow defines a source or destination of system data is a data store-data at rest, or a temporary repository of data represents a process that transforms incoming data flow(s) into outgoing data flows None of these identifies data flow defines a source or destination of system data is a data store-data at rest, or a temporary repository of data ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is not a factor in the failure of a systems development project ? inadequate user involvement continuation of a project that should have been cancelled size of company failure of systems integration None of these inadequate user involvement continuation of a project that should have been cancelled size of company failure of systems integration None of these ANSWER DOWNLOAD EXAMIANS APP