Power Systems Which of the following buses is/are not PV buses? fixed shunt capacitor buses both 1 and 2 reactive power support buses voltage control buses fixed shunt capacitor buses both 1 and 2 reactive power support buses voltage control buses ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows : Ipositive = j1.5 pu, Inegative = − j0.5 pu, Izero = − j pu Which fault is this? LL. LLG. LG. LLLG. LL. LLG. LG. LLLG. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following transmission line is most practically used in load flow analysis? either 1 or 2 nether 1 nor 2 Nominal T Nominal ∏ either 1 or 2 nether 1 nor 2 Nominal T Nominal ∏ ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pipes carrying steam are generally of aluminium. steel. cobalt. cast iron. aluminium. steel. cobalt. cast iron. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the fault is very nearer to the generator, the fault current is zero less any of the above larger zero less any of the above larger ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statements is/are true? The elements of each row of a Y bus matrix for load flow studies in power system add up to zero if the shunt admittances at the buses are ignored if both 2 and 3 are satisfied if the mutual couplings between transmission lines are absent always if the shunt admittances at the buses are ignored if both 2 and 3 are satisfied if the mutual couplings between transmission lines are absent always ANSWER DOWNLOAD EXAMIANS APP