Power Systems Which of the following buses is/are not PV buses? voltage control buses both 1 and 2 fixed shunt capacitor buses reactive power support buses voltage control buses both 1 and 2 fixed shunt capacitor buses reactive power support buses ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a transmission line can be increased by addition of lumped capacitance in series both 1 and 3 addition of lumped inductance in parallel increasing its voltage level addition of lumped capacitance in series both 1 and 3 addition of lumped inductance in parallel increasing its voltage level ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statement is/are true?Zn The neutral grounding impedance Zn appears as 3Zn in zero sequence equivalent circuit both 1 and 2 nether 1 nor 2 The neutral grounding impedance Zn appears as Zn in zero sequence equivalent circuit The neutral grounding impedance Zn appears as 3Zn in zero sequence equivalent circuit both 1 and 2 nether 1 nor 2 The neutral grounding impedance Zn appears as Zn in zero sequence equivalent circuit ANSWER DOWNLOAD EXAMIANS APP
Power Systems Under over excitation synchronous phase modifier works as series capacitor any of the above shunt capacitor shunt reactor series capacitor any of the above shunt capacitor shunt reactor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following represents the transmission line positive sequence reactance Xm - Xs Xs - Xm 2Xs + Xm Xs +2 Xm Xm - Xs Xs - Xm 2Xs + Xm Xs +2 Xm ANSWER DOWNLOAD EXAMIANS APP
Power Systems To improve the efficiency of thermal power plant ________________ is placed between boiler and turbine. superheater. economizer. air preheater. ash handling point. superheater. economizer. air preheater. ash handling point. ANSWER DOWNLOAD EXAMIANS APP