Power Systems If the fault current is 2000 A, the relay setting is 50% and CT ratio is 400 : 5, then plug setting multiplier will be 50. 15. 10. 25. 50. 15. 10. 25. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 740 MW. 710 MW. 730 MW. 720 MW. 740 MW. 710 MW. 730 MW. 720 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are the disadvantages of phase modifiers? Initial cost of synchronous phase modifier is higher It requires more maintenance because of running equipment All of these It consumes both active and reactive power Initial cost of synchronous phase modifier is higher It requires more maintenance because of running equipment All of these It consumes both active and reactive power ANSWER DOWNLOAD EXAMIANS APP
Power Systems In case of failure of prime mover of the generator, which type of relay is used? distance relays reverse power relay impedance relay offset mho relay distance relays reverse power relay impedance relay offset mho relay ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 3. 20. 5. 7. 3. 20. 5. 7. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Switchgear equipment include switches. relays and CB. fuses. all of these. switches. relays and CB. fuses. all of these. ANSWER DOWNLOAD EXAMIANS APP