MGVCL Exam Paper (30-07-2021 Shift 1)
Which of the following are the advantages of Aerial Bunched Cables (ABC)?

Higher safety and reliability
All of these
Elimination of theft of energy
Reduced height of supports

ANSWER DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
The necessary equation to be solved during the load flow analysis using Fast-Decoupled methid is given below:
where B' and B'' are formed using the imaginary part of the bus admittance matrix Ybus, n is the total number of buses in the system, m is the number of voltage regulated buses. The size of matrix B' is
∆P/|Vi|= -B' ∆δ
∆Q/|Vi| = -B'' ∆|Vi|

(n-m) x (n-m)
(n-m-1) x (n-m-1)
(n-1) x (n-1)
(m-1) x (m-1)

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
In underground cables, the electrostatic stress is ___ at contactor surface and ___ at the sheath.

zero, minimum
minimum, maximum
zero, zero
minimum, maximum

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Determine maximum permissible load which a 15 MVA, ONAN cooled transformer to IS : 2026 can take for 6 hr, if the initial load on it was 12 MVA. The weighted ambient temperature is 20˚C. Assume the permissible load kVA as a fraction of rated kVA is 1.25.

9.6 MVA
12 MVA
18.75 MVA
15 MVA

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP