Power Systems Which of following power plants normally operage at high speeds Hydro electric. Diesel engine. Thermal. Petrol engine. Hydro electric. Diesel engine. Thermal. Petrol engine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Nuclear power plant. Gas turbine plant. Hydro electric power plant. Thermal power plant. Nuclear power plant. Gas turbine plant. Hydro electric power plant. Thermal power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where air circuit breakers are used? Up to 12 kV. Up to 33 kV. Up to 66 kV. Up to 11 kV. Up to 12 kV. Up to 33 kV. Up to 66 kV. Up to 11 kV. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of pumped storage plants is/are All of these most economical as a peak load supply plant used as load frequency control operating time is minimum All of these most economical as a peak load supply plant used as load frequency control operating time is minimum ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are the disadvantages of phase modifiers? Initial cost of synchronous phase modifier is higher It requires more maintenance because of running equipment All of these It consumes both active and reactive power Initial cost of synchronous phase modifier is higher It requires more maintenance because of running equipment All of these It consumes both active and reactive power ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following represents the transmission line positive sequence reactance Xs - Xm Xs +2 Xm Xm - Xs 2Xs + Xm Xs - Xm Xs +2 Xm Xm - Xs 2Xs + Xm ANSWER DOWNLOAD EXAMIANS APP