Here, we have to find the value of 7/(8/9) - (7/8)/9.(7 x 9/8) - [(7/(8 x 9)]63/8 - 7/72[(63 x 9) - 7] / 72567 - 7/72 = 560/72 = 70/9 = 7 7/9.Hence, 7/(8/9) is greater than (7/8)/9 by 7 7/9.
Converting each of the given fractions into decimal form, we get,5/6 = 0.838/15 = 0.532/3 = 0.663/4 = 0.754/5 = 0.86/7 = 0.85Clearly, 0.85 does not lie between 0.83 and 0.53Hence the required fraction is 6/7.
Time required for service before overhauling = 2/3h = 40 min in 45 days and time required for service after overhauling =2/3h= 40 min in 60 days Now,LCM of 45 and 60 = 180 days time required for service before overhauling is 180 days = 40 x 4 = 160 min and time required for service before overhauling is 180 days =40 x 3 = 120 min ∴ fraction of time saved = 160 - 120/160 =40/160 = 1/4