Waste Water Engineering For efficient working of a sewer, it must be ensured that A maximum velocity of 0.90 m/sec, is maintained at its maximum flow Both (A) and (B) Minimum velocity of 0.45 m/sec, is maintained at its minimum flow Neither (A) nor (B) A maximum velocity of 0.90 m/sec, is maintained at its maximum flow Both (A) and (B) Minimum velocity of 0.45 m/sec, is maintained at its minimum flow Neither (A) nor (B) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In olden days the type of section adopted in trunk and out fall sewers was Circular shaped Egg shaped Parabolic shaped Horse shoe shaped Circular shaped Egg shaped Parabolic shaped Horse shoe shaped ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known Sewer outfall Branch sewer Lateral sewer House sewer Sewer outfall Branch sewer Lateral sewer House sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Lead acetate test in sewer manhole is done to test the presence of Methane gas Hydrogen sulphide Carbondioxide gas Diesel vapours Methane gas Hydrogen sulphide Carbondioxide gas Diesel vapours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewers Must be of adequate size to avoid over flow Must flow under gravity ½ to ¾ full Must be laid at least 2 to 3 m deep to collect /water from the basements All listed here Must be of adequate size to avoid over flow Must flow under gravity ½ to ¾ full Must be laid at least 2 to 3 m deep to collect /water from the basements All listed here ANSWER DOWNLOAD EXAMIANS APP