Waste Water Engineering Dry water flow in a combined sewer, is Domestic sewage Industrial sewage Storm water Inclusive of domestic and industrial sewage but excludes storm water Domestic sewage Industrial sewage Storm water Inclusive of domestic and industrial sewage but excludes storm water ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A sewer running partially full and hurried with back filled, fails in compression due to Weight of the pipe Superimposed traffic loads All listed here Weight of the back fill Weight of the pipe Superimposed traffic loads All listed here Weight of the back fill ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of design discharge to the surface area of a sedimentation tank is called Overflow velocity Surface loading Overflow rate All of these Overflow velocity Surface loading Overflow rate All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum depth of sedimentation tanks, is kept 3 m 4.5 m 4 m 3.5 m 3 m 4.5 m 4 m 3.5 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Chlorination of water is done for the removal of Hardness Sediments Suspended solids Bacterias Hardness Sediments Suspended solids Bacterias ANSWER DOWNLOAD EXAMIANS APP