Chlorination of water is done for the removal of

Bacterias
Suspended solids
Hardness
Sediments

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
In normal conditions, the period for sludge digestion, is

60 days
20 days
30 days
10 days

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Removal of oil and grease from sewage, is known

Skimming
Filtration
Screening
None of these

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
It is customary to design a sewer for D.W.F. on the basis of

Four times the average demand
Twice the average demand
Thrice the average demand
Average demand

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Pathogens (or pathogenic bacterias) in water may cause

Cholera
All listed here
Typhoid
Dysentery

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The discharge per unit plan area of a sedimentation tank, is generally called

Surface loading
Over flow velocity
Over flow rate
All of these

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Waste Water Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑