Waste Water Engineering Chlorination of water is done for the removal of Sediments Hardness Bacterias Suspended solids Sediments Hardness Bacterias Suspended solids ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The temperature affects the Viscosity of sewage Solubility of gases in sewage All of these Biological activity of bacteria in sewage Viscosity of sewage Solubility of gases in sewage All of these Biological activity of bacteria in sewage ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer ventilating columns are generally placed at All listed here Every change in the size of sewers Distances 150 m to 300 m Upper ends of branch sewers All listed here Every change in the size of sewers Distances 150 m to 300 m Upper ends of branch sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Lead caulked joints are used for laying I. pipes Earthenware pipes G.I. pipes Stone ware pipes I. pipes Earthenware pipes G.I. pipes Stone ware pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The minimum diameter of a sewer is kept 15 cm 25 cm 20 cm 10 cm 15 cm 25 cm 20 cm 10 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a fully mechanised composting plant, involves Mechanized receipt All of these Mechanized segregation Mechanized pulverising of refuse Mechanized receipt All of these Mechanized segregation Mechanized pulverising of refuse ANSWER DOWNLOAD EXAMIANS APP