Waste Water Engineering Chlorination of water is done for the removal of Suspended solids Bacterias Hardness Sediments Suspended solids Bacterias Hardness Sediments ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The screens are fixed At an angle 30° to 60° to the direction of flow None of these Perpendicular to the direction of flow Parallel to the direction of flow At an angle 30° to 60° to the direction of flow None of these Perpendicular to the direction of flow Parallel to the direction of flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In case of Imhoff tanks, The shape is rectangular Detention period is 2 hours All of these The velocity of flow is restricted to 0.30 m/minute The shape is rectangular Detention period is 2 hours All of these The velocity of flow is restricted to 0.30 m/minute ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 3 to 5 2 to 3 5 to 10 1 3 to 5 2 to 3 5 to 10 1 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which one of the following statements regarding septic tanks is wrong? The minimum width of septic level is 90 cm The depth of tank is kept equal to its width A gap of 7.5 cm between the bottom of the covering slab and the top level of scum is provided The outlet invert level is kept 5 to 7.5 cm below the inlet invert level The minimum width of septic level is 90 cm The depth of tank is kept equal to its width A gap of 7.5 cm between the bottom of the covering slab and the top level of scum is provided The outlet invert level is kept 5 to 7.5 cm below the inlet invert level ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which of the following pumps in used to pump sewage solids with liquid sewage without clogging the pump is? None of these Centrifugal pump Reciprocating pump Pneumatic ejector None of these Centrifugal pump Reciprocating pump Pneumatic ejector ANSWER DOWNLOAD EXAMIANS APP