Irrigation Engineering Vertical drop fall is satisfactory for a height upto 1.5 m 3.5 m 0.5 m 5.0 m 1.5 m 3.5 m 0.5 m 5.0 m ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a Sarda type fall, the rectangular crest, may be used for discharge up to 6 cumecs 20 cumecs 10 cumecs 14 cumecs 6 cumecs 20 cumecs 10 cumecs 14 cumecs ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable section of a lined canal, is Trapezoidal section with rounded corners for large canals Both (a) and (b) Triangular section with circular bottom for small canals None of these Trapezoidal section with rounded corners for large canals Both (a) and (b) Triangular section with circular bottom for small canals None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the irrigation efficiency is 80%, conveyance losses are 20% and the actual depth of watering is 16 cm, the depth of water required at the canal outlet, is 10 cm 25 cm 15 cm 20 cm 10 cm 25 cm 15 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The main function of a diversion head works of a canal from a river, is To remove silt To control floods To store water To raise water level To remove silt To control floods To store water To raise water level ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Variability of rainfall isi) largest in regions of high rainfallii) largest in coastal areasiii) largest in regions of scanty rainfallThe correct answer is (i) and (ii) (ii) and (iii) only (iii) only (i) (i) and (ii) (ii) and (iii) only (iii) only (i) ANSWER DOWNLOAD EXAMIANS APP