Irrigation Engineering The structure constructed to allow drainage water to flow under pressure through an inverted syphon below a canal, is called Syphon Super-aqueduct Super passage Syphon aqueduct Syphon Super-aqueduct Super passage Syphon aqueduct ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The kor depth for rice is 190 mm and kor period is 14 days. The outlet factor for this will be 1172 hectares/m3/sec 837 hectares/m3/sec 637 hectares/m3/sec 972 hectares/m3/sec 1172 hectares/m3/sec 837 hectares/m3/sec 637 hectares/m3/sec 972 hectares/m3/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Attracting groynes are built None of these Inclined up stream Inclined down stream Perpendicular to the bank None of these Inclined up stream Inclined down stream Perpendicular to the bank ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The drainage water intercepting the canal can be disposed of by passing the canal below the drainage in level crossing aqueduct and super passage super passage and canal syphon aqueduct and syphon aqueduct level crossing aqueduct and super passage super passage and canal syphon aqueduct and syphon aqueduct ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The consumptive use of water for a crop May be supplied partly by precipitation and partly by irrigation All of these Is measured as the volume of water per unit area Is measured as depth of water on irrigated area May be supplied partly by precipitation and partly by irrigation All of these Is measured as the volume of water per unit area Is measured as depth of water on irrigated area ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Borrow pits should preferably be located in Field on the left side of the canal Central half width of the section of the canal Fields on both sides of the canal Field on the right side of the canal Field on the left side of the canal Central half width of the section of the canal Fields on both sides of the canal Field on the right side of the canal ANSWER DOWNLOAD EXAMIANS APP