Irrigation Engineering The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be 35 m3/sec 30 m3/sec 25 m3/sec 20 m3/sec 35 m3/sec 30 m3/sec 25 m3/sec 20 m3/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following canal structures is used to remove surplus water from an irrigation channel into a natural drain ? canal regulator canal escape canal outlet canal fall canal regulator canal escape canal outlet canal fall ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering River training for depth is achieved by both (A) and (B) construction of dykes or leavees groynes groynes and bandalling both (A) and (B) construction of dykes or leavees groynes groynes and bandalling ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following canal outlets maintains a constant discharge ? rigid module flexible outlet None of these non-modular outlet rigid module flexible outlet None of these non-modular outlet ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Irrigation canals are generally aligned along Straight line Ridge line Valley line Contour line Straight line Ridge line Valley line Contour line ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The main function of a diversion head works of a canal from a river, is To raise water level To control floods To store water To remove silt To raise water level To control floods To store water To remove silt ANSWER DOWNLOAD EXAMIANS APP