Irrigation Engineering The net speed under which the turbine reaches its peak efficiency is called rated speed operating speed design speed gross speed rated speed operating speed design speed gross speed ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If it rains between 2 P.M. and 3 P.M. and the entire basin area just starts contributing water at 3 P.M. to the outlet, then time of concentration will be 15 minutes 30 minutes 60 minutes 20 minutes 15 minutes 30 minutes 60 minutes 20 minutes ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the demand line drawn from a ridge in a flow mass curve does not intersect the curve again, it indicates that reservoir was not full at the beginning None of these demand cannot be met by inflow both (A) and (B) reservoir was not full at the beginning None of these demand cannot be met by inflow both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The main function of a diversion head works of a canal from a river, is To raise water level To control floods To store water To remove silt To raise water level To control floods To store water To remove silt ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Infiltration capacity changes with location changes with both time and location changes with time is a constant factor changes with location changes with both time and location changes with time is a constant factor ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The saturation line is the line up to which banks get saturated after the canal runs for some time. The saturation gradient in ordinary loam soil, is generally 0.084027777777778 0.16736111111111 0.20902777777778 0.12569444444444 0.084027777777778 0.16736111111111 0.20902777777778 0.12569444444444 ANSWER DOWNLOAD EXAMIANS APP