Irrigation Engineering The net speed under which the turbine reaches its peak efficiency is called gross speed operating speed design speed rated speed gross speed operating speed design speed rated speed ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the intensity of rainfall is more than the infiltration capacity of soil, then the infiltration rate will be equal to infiltration capacity more than rate of rainfall equal to rate of rainfall more than infiltration capacity equal to infiltration capacity more than rate of rainfall equal to rate of rainfall more than infiltration capacity ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering An outlet which maintains a constant discharge irrespective of fluctuation in the water levels of the supplying channel or water course, is known as Non-modular outlet Semi-modular outlet Right modular outlet Flexible modular outlet Non-modular outlet Semi-modular outlet Right modular outlet Flexible modular outlet ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The state of the soil when plants fail to extract sufficient water for their requirements, is Maximum saturated point Ultimate utilization point None of these Permanent wilting point Maximum saturated point Ultimate utilization point None of these Permanent wilting point ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Irrigation canals are generally aligned along Straight line Valley line Ridge line Contour line Straight line Valley line Ridge line Contour line ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct statement from the following and answer In a level crossing, a cross regulator is provided on the canal below the crossing All of these In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream In a level crossing, a cross regulator is provided on the canal below the crossing All of these In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream ANSWER DOWNLOAD EXAMIANS APP