Irrigation Engineering The net speed under which the turbine reaches its peak efficiency is called operating speed design speed rated speed gross speed operating speed design speed rated speed gross speed ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For designing the venturi head, Width of the throat should not be less than one-third of the bed width of main canal All listed here Length of the throat should be 2.5 times the depth measured to F.S.L. in the main canal Minimum throat width should not be less than 60 cm Width of the throat should not be less than one-third of the bed width of main canal All listed here Length of the throat should be 2.5 times the depth measured to F.S.L. in the main canal Minimum throat width should not be less than 60 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For diversion of flood water of rivers, the type of canal constructed, is Perennial canal Inundation canal Canal Ridge canal Perennial canal Inundation canal Canal Ridge canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Meandering of a river generally occurs, in Rocky stage Boulder stage Delta stage Trough stage Rocky stage Boulder stage Delta stage Trough stage ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If it rains between 2 P.M. and 3 P.M. and the entire basin area just starts contributing water at 3 P.M. to the outlet, then time of concentration will be 60 minutes 15 minutes 30 minutes 20 minutes 60 minutes 15 minutes 30 minutes 20 minutes ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the demand line drawn from a ridge in a flow mass curve does not intersect the curve again, it indicates that demand cannot be met by inflow None of these both (A) and (B) reservoir was not full at the beginning demand cannot be met by inflow None of these both (A) and (B) reservoir was not full at the beginning ANSWER DOWNLOAD EXAMIANS APP