Irrigation Engineering The net speed under which the turbine reaches its peak efficiency is called operating speed gross speed rated speed design speed operating speed gross speed rated speed design speed ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Finally formed berms in canals are provided for Protection of banks erosion by the waves Control of seepage losses All of these Strengthening of banks Protection of banks erosion by the waves Control of seepage losses All of these Strengthening of banks ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a chute spillway, the flow is usually critical super critical subcritical uniform critical super critical subcritical uniform ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable location of a canal head work, is Delta stage of the river Rock stage of the river Trough stage of the river Boulders stage of the river Delta stage of the river Rock stage of the river Trough stage of the river Boulders stage of the river ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The depth of rice root zone, is 80 cm 60 cm 90 cm 50 cm 80 cm 60 cm 90 cm 50 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The field capacity of a soil depends upon Both (a) and (b) Capillary tension in soil Porosity of soil Neither (a) nor (b) Both (a) and (b) Capillary tension in soil Porosity of soil Neither (a) nor (b) ANSWER DOWNLOAD EXAMIANS APP