Irrigation Engineering The net speed under which the turbine reaches its peak efficiency is called design speed rated speed operating speed gross speed design speed rated speed operating speed gross speed ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The width of a meander belt is the transverse distance between Apex point and the crossing Apex point of one curve and apex point of the reserve curve None of these Two banks of meandering river Apex point and the crossing Apex point of one curve and apex point of the reserve curve None of these Two banks of meandering river ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Seepage through foundation in an earthen dam is controlled by providing horizontal blanket chimney drain rock toe impervious cut off horizontal blanket chimney drain rock toe impervious cut off ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the height of the hydraulic gradient line above the floor of thickness t is h and the specific gravity of the material of the floor is G, the minimum thickness t of the floor downstream of the crest-wall, is given by the equation t = (h + 1)/G t = (h + 1)/(G + t) t = (h - 1)/(G - t) t = (h - 1)/(G + t) t = (h + 1)/G t = (h + 1)/(G + t) t = (h - 1)/(G - t) t = (h - 1)/(G + t) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A minimum of 90 cm free board is provided if the discharge in the canal is between 30 to 33 cumecs 30 to 60 cumecs Over 60 cumecs Over 100 cumecs 30 to 33 cumecs 30 to 60 cumecs Over 60 cumecs Over 100 cumecs ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct statement from the following and answer In a level crossing a regulator is provided across the drainage at its down-stream In a level crossing, a cross regulator is provided on the canal below the crossing All of these In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream In a level crossing, a cross regulator is provided on the canal below the crossing All of these In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal ANSWER DOWNLOAD EXAMIANS APP