Irrigation Engineering Infiltration is the absorption of water by soil surface both (A) and (B) None of these movement of water through the soil absorption of water by soil surface both (A) and (B) None of these movement of water through the soil ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If L is total length of a canal in kilometers, P is total perimeter of its lining in metres and C is the cost of lining per square metre, the additional expenditure involved on lining, is PLC/1000 100 PLC PL/1000C PC/100L PLC/1000 100 PLC PL/1000C PC/100L ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Seepage through foundation in an earthen dam is controlled by providing horizontal blanket chimney drain rock toe impervious cut off horizontal blanket chimney drain rock toe impervious cut off ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following spillways is least suitable for an earthen dam ? side channel spillway chute spillway shaft spillway ogee spillway side channel spillway chute spillway shaft spillway ogee spillway ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The level of the floor of a syphon aqueduct can be obtained By subtracting the depth of the culvert from the canal bed level None of these Both (a) and (b) By subtracting the thickness of culvert plus the depth of the culvert from the canal bed level By subtracting the depth of the culvert from the canal bed level None of these Both (a) and (b) By subtracting the thickness of culvert plus the depth of the culvert from the canal bed level ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The top of the capillary zone Lies below the water table at every point Coincides the water table at every point None of these Lies above the water table at every point Lies below the water table at every point Coincides the water table at every point None of these Lies above the water table at every point ANSWER DOWNLOAD EXAMIANS APP