Irrigation Engineering Infiltration is the absorption of water by soil surface movement of water through the soil both (A) and (B) None of these absorption of water by soil surface movement of water through the soil both (A) and (B) None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Lacey's equation for calculating flood discharge in rivers, is V = 10.8 R1/2 S1/2 V = 10.8 R1/3 S2/3 V = 10.8 R2/3 S1/3 V = 10.8 R2/3 S1/2 V = 10.8 R1/2 S1/2 V = 10.8 R1/3 S2/3 V = 10.8 R2/3 S1/3 V = 10.8 R2/3 S1/2 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called Height of bank Berm Free board None of these Height of bank Berm Free board None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The downstream expansion head of a guide bank is extended to subtend an angle at the centre, equal to 30° 60° 45° 90° 30° 60° 45° 90° ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a concrete canal the approximate permissible velocity of water should not exceed 0.5 m/sec 2 m/sec 1.5 m/sec 1 m/sec 0.5 m/sec 2 m/sec 1.5 m/sec 1 m/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Horizontal acceleration due to earthquake results in hydrodynamic pressure both (A) and (B) inertia force into the body of the dam None of these hydrodynamic pressure both (A) and (B) inertia force into the body of the dam None of these ANSWER DOWNLOAD EXAMIANS APP