Irrigation Engineering The unit hydrograph due to a storm may be obtained by dividing the ordinates of the direct runoff hydrograph by None of these total rainfall direct runoff volume period of storm None of these total rainfall direct runoff volume period of storm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be 35 m3/sec 25 m3/sec 20 m3/sec 30 m3/sec 35 m3/sec 25 m3/sec 20 m3/sec 30 m3/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The water utilizable by plants is available in soils mainly in the form of gravity water chemical water capillary water hydroscopic water gravity water chemical water capillary water hydroscopic water ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Infiltration is the movement of water through the soil absorption of water by soil surface None of these both (A) and (B) movement of water through the soil absorption of water by soil surface None of these both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A minimum of 90 cm free board is provided if the discharge in the canal is between Over 100 cumecs 30 to 33 cumecs 30 to 60 cumecs Over 60 cumecs Over 100 cumecs 30 to 33 cumecs 30 to 60 cumecs Over 60 cumecs ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Cross regulators in main canals are provided To regulate water supply in the distributaries None of these To increase water head upstream when a main canal is running with low supplies To overflow excessive flow water To regulate water supply in the distributaries None of these To increase water head upstream when a main canal is running with low supplies To overflow excessive flow water ANSWER DOWNLOAD EXAMIANS APP