Irrigation Engineering
In case of a trapezoidal notch fall

Splay downstream from the notch section is 22½°
Top length of the piers should not be less than their thickness
Splay upstream from the notch section is 45°
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
Pick up the correct statement from the following and answer

In a level crossing, a cross regulator is provided on the canal below the crossing
In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal
All of these
In a level crossing a regulator is provided across the drainage at its down-stream

ANSWER DOWNLOAD EXAMIANS APP