Irrigation Engineering In case of a trapezoidal notch fall Splay downstream from the notch section is 22½° All listed here Top length of the piers should not be less than their thickness Splay upstream from the notch section is 45° Splay downstream from the notch section is 22½° All listed here Top length of the piers should not be less than their thickness Splay upstream from the notch section is 45° ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Process of meandering is due to Discharge and hydraulic properties of streams Relative erodibility of the bed and banks Sediment load of streams All listed here Discharge and hydraulic properties of streams Relative erodibility of the bed and banks Sediment load of streams All listed here ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The unit hydrograph due to a storm may be obtained by dividing the ordinates of the direct runoff hydrograph by period of storm direct runoff volume total rainfall None of these period of storm direct runoff volume total rainfall None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The top of the capillary zone Lies below the water table at every point Coincides the water table at every point Lies above the water table at every point None of these Lies below the water table at every point Coincides the water table at every point Lies above the water table at every point None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The depth of rice root zone, is 50 cm 60 cm 80 cm 90 cm 50 cm 60 cm 80 cm 90 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of average values of shear stresses produced on the bed and the banks of a channel due to flowing water is greater than 1 less than 1 equal to zero equal to 1 greater than 1 less than 1 equal to zero equal to 1 ANSWER DOWNLOAD EXAMIANS APP