Irrigation Engineering The most suitable section of a lined canal, is None of these Trapezoidal section with rounded corners for large canals Triangular section with circular bottom for small canals Both (a) and (b) None of these Trapezoidal section with rounded corners for large canals Triangular section with circular bottom for small canals Both (a) and (b) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Effective precipitation for a crop may be defined as Total precipitation minus the loss due to evaporation Total precipitation during the crop period Total precipitation minus the loss due to infiltration Available water stored in soil within root zone of the crop Total precipitation minus the loss due to evaporation Total precipitation during the crop period Total precipitation minus the loss due to infiltration Available water stored in soil within root zone of the crop ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following methods is used to estimate flood discharge based on high water marks left over in the past ? area-velocity method slope-area method ultra-sonic method moving boat method area-velocity method slope-area method ultra-sonic method moving boat method ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A 6 hours storm had 4 cm of rainfall and the resulting runoff was 2 cm. If 4.5 cm 5 cm 6.0 cm 4 cm 4.5 cm 5 cm 6.0 cm 4 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the demand line drawn from a ridge in a flow mass curve does not intersect the curve again, it indicates that reservoir was not full at the beginning None of these demand cannot be met by inflow both (A) and (B) reservoir was not full at the beginning None of these demand cannot be met by inflow both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called Free board None of these Height of bank Berm Free board None of these Height of bank Berm ANSWER DOWNLOAD EXAMIANS APP