Irrigation Engineering A current meter is used to measure the None of these velocity of flow of water depth of flow of water discharge None of these velocity of flow of water depth of flow of water discharge ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering An aggrading river is a both silting and scouring river neither silting nor scouring river silting river scouring river both silting and scouring river neither silting nor scouring river silting river scouring river ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For supplying water to rabi crop, kharif crop and sugarcane, the channel is designed for a capacity equal to the greater of the water requirement of rabi and kharif or sugarcane rabi or kharif rabi and sugarcane or kharif and sugarcane rabi or kharif or sugarcane rabi and kharif or sugarcane rabi or kharif rabi and sugarcane or kharif and sugarcane rabi or kharif or sugarcane ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Meandering of a river generally occurs, in Delta stage Trough stage Boulder stage Rocky stage Delta stage Trough stage Boulder stage Rocky stage ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The kor depth for rice is 190 mm and kor period is 14 days. The outlet factor for this will be 837 hectares/m3/sec 1172 hectares/m3/sec 972 hectares/m3/sec 637 hectares/m3/sec 837 hectares/m3/sec 1172 hectares/m3/sec 972 hectares/m3/sec 637 hectares/m3/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the irrigation efficiency is 80%, conveyance losses are 20% and the actual depth of watering is 16 cm, the depth of water required at the canal outlet, is 25 cm 20 cm 10 cm 15 cm 25 cm 20 cm 10 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP