Irrigation Engineering A current meter is used to measure the depth of flow of water None of these discharge velocity of flow of water depth of flow of water None of these discharge velocity of flow of water ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The net head under which the turbine reaches its peak efficiency at synchronous speed is called gross head design head operating head rated head gross head design head operating head rated head ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct sequence of the part of a canal system from the following Head works-main canal-branch canal-minor-distributary Head works-main canal-branch canal-distributary-minor Heads works-branch canal-main canal distributary, minor Head work-distributary-branch canal-minor Head works-main canal-branch canal-minor-distributary Head works-main canal-branch canal-distributary-minor Heads works-branch canal-main canal distributary, minor Head work-distributary-branch canal-minor ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be 25 m3/sec 20 m3/sec 30 m3/sec 35 m3/sec 25 m3/sec 20 m3/sec 30 m3/sec 35 m3/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering When a canal flowing under pressure is carried below a natural drainage such that its F.S.L. doesnot touch the underside of the supporting structure, the structure so provided, is called Aqueduct Super passage Syphon Syphon-aqueduct Aqueduct Super passage Syphon Syphon-aqueduct ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If D₁ and D₂ are depths of water upstream and downstream of a hydraulic jump, the loss of head at the jump, is (D₂ - D₁)3/D₁D₂ (D₂ - D₁)3/3D₁D₂ (D₂ - D₁)3/2D₁D₂ (D₂ - D₁)3/4D₁D₂ (D₂ - D₁)3/D₁D₂ (D₂ - D₁)3/3D₁D₂ (D₂ - D₁)3/2D₁D₂ (D₂ - D₁)3/4D₁D₂ ANSWER DOWNLOAD EXAMIANS APP