Irrigation Engineering Hydrodynamic pressure due to earthquake acts at a height of 4H/3π below the water surface, where H is the depth of water 3H/4π below the water surface 3H/4π above the base 4H/3π above the base 4H/3π below the water surface, where H is the depth of water 3H/4π below the water surface 3H/4π above the base 4H/3π above the base ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to Plant factor Utilization factor Load factor Both load and plant factor Plant factor Utilization factor Load factor Both load and plant factor ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable section of a lined canal, is Triangular section with circular bottom for small canals Both (a) and (b) None of these Trapezoidal section with rounded corners for large canals Triangular section with circular bottom for small canals Both (a) and (b) None of these Trapezoidal section with rounded corners for large canals ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The main function of a diversion head works of a canal from a river, is To store water To remove silt To control floods To raise water level To store water To remove silt To control floods To raise water level ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The value of Sodium Absorption Ratio for high sodium water lies between 0 to 10 10 to 18 26 to 34 18 to 26 0 to 10 10 to 18 26 to 34 18 to 26 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of the quantity of water stored in the root zone of the crops to the quantity of water actually delivered in the field is known as water conveyance efficiency None of these water application efficiency water use efficiency water conveyance efficiency None of these water application efficiency water use efficiency ANSWER DOWNLOAD EXAMIANS APP