Irrigation Engineering Pick up the correct sequence of the part of a canal system from the following Head work-distributary-branch canal-minor Heads works-branch canal-main canal distributary, minor Head works-main canal-branch canal-minor-distributary Head works-main canal-branch canal-distributary-minor Head work-distributary-branch canal-minor Heads works-branch canal-main canal distributary, minor Head works-main canal-branch canal-minor-distributary Head works-main canal-branch canal-distributary-minor ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering When a canal flowing under pressure is carried below a natural drainage such that its F.S.L. doesnot touch the underside of the supporting structure, the structure so provided, is called Syphon-aqueduct Super passage Aqueduct Syphon Syphon-aqueduct Super passage Aqueduct Syphon ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In gravity canals, F.S.L. is Only a few cm above the ground level Always below the ground level Generally 4 to 5 metres above the ground level Always at the ground level Only a few cm above the ground level Always below the ground level Generally 4 to 5 metres above the ground level Always at the ground level ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The maximum permissible eccentricity for no tension at the base of a gravity dam is B/2 B/4 B/3 B/6 B/2 B/4 B/3 B/6 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct statement from the following and answer In a level crossing a regulator is provided across the drainage at its down-stream In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal All of these In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing a regulator is provided across the drainage at its down-stream In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal All of these In a level crossing, a cross regulator is provided on the canal below the crossing ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For designing the venturi head, Length of the throat should be 2.5 times the depth measured to F.S.L. in the main canal All listed here Width of the throat should not be less than one-third of the bed width of main canal Minimum throat width should not be less than 60 cm Length of the throat should be 2.5 times the depth measured to F.S.L. in the main canal All listed here Width of the throat should not be less than one-third of the bed width of main canal Minimum throat width should not be less than 60 cm ANSWER DOWNLOAD EXAMIANS APP