Irrigation Engineering Pick up the correct sequence of the part of a canal system from the following Heads works-branch canal-main canal distributary, minor Head work-distributary-branch canal-minor Head works-main canal-branch canal-distributary-minor Head works-main canal-branch canal-minor-distributary Heads works-branch canal-main canal distributary, minor Head work-distributary-branch canal-minor Head works-main canal-branch canal-distributary-minor Head works-main canal-branch canal-minor-distributary ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering To control the silt entry into a distributary at head regulator, King's vanes are provided which are the walls All listed here Spaced at interval of 1½ times their heights Of R.C.C. or steel plate 8 cm thick Of height ⅓rd to ¼th the depth of water in the main canal All listed here Spaced at interval of 1½ times their heights Of R.C.C. or steel plate 8 cm thick Of height ⅓rd to ¼th the depth of water in the main canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The "outlet discharge factor" is the duty at the head of distributory watercourse branch canal main canal distributory watercourse branch canal main canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The useful storage is the volume of water stored in the reservoir between minimum pool level and normal pool level normal pool level and maximum pool level minimum pool level and maximum pool level river bed and minimum pool level minimum pool level and normal pool level normal pool level and maximum pool level minimum pool level and maximum pool level river bed and minimum pool level ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The measure to remove water logging of land, is Neither (a) nor (b) To reduce percolation from canals and water courses To increase outflow from the ground water reservoir Both (a) and (b) Neither (a) nor (b) To reduce percolation from canals and water courses To increase outflow from the ground water reservoir Both (a) and (b) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If there are two canals taking off from each flank of a river, then there will be one divide wall and one undersluice two divide walls and one undersluice one divide wall and two undersluices two divide walls and two undersluices one divide wall and one undersluice two divide walls and one undersluice one divide wall and two undersluices two divide walls and two undersluices ANSWER DOWNLOAD EXAMIANS APP