Irrigation Engineering Pick up the correct sequence of the part of a canal system from the following Heads works-branch canal-main canal distributary, minor Head works-main canal-branch canal-minor-distributary Head works-main canal-branch canal-distributary-minor Head work-distributary-branch canal-minor Heads works-branch canal-main canal distributary, minor Head works-main canal-branch canal-minor-distributary Head works-main canal-branch canal-distributary-minor Head work-distributary-branch canal-minor ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following methods of applying water may be used on rolling land ? boarder flooding free flooding furrow flooding check flooding boarder flooding free flooding furrow flooding check flooding ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If it rains between 2 P.M. and 3 P.M. and the entire basin area just starts contributing water at 3 P.M. to the outlet, then time of concentration will be 30 minutes 60 minutes 20 minutes 15 minutes 30 minutes 60 minutes 20 minutes 15 minutes ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering According to Lacey, depth of scour in a river depends upon the straightness of the reach. If D is the depth of scour in regime flow in a right angled bend, it is 2.00 D 1.25 D 1.50 D 1.75 D 2.00 D 1.25 D 1.50 D 1.75 D ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Cyclonic precipitation is caused by lifting of an air mass due to natural topographical barriers All of these pressure difference temperature difference natural topographical barriers All of these pressure difference temperature difference ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The length of a meander is the distance along the river between the tangent point of one curve to the tangent point of Next curve of the same order None of these Reverse curve plus the width of the river Reverse curve Next curve of the same order None of these Reverse curve plus the width of the river Reverse curve ANSWER DOWNLOAD EXAMIANS APP