Irrigation Engineering The most suitable material for the central impervious core of a zoned embankment type dam is clay coarse sand silty clay clay mixed with fine sand clay coarse sand silty clay clay mixed with fine sand ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Horizontal acceleration due to earthquake results in None of these hydrodynamic pressure inertia force into the body of the dam both (A) and (B) None of these hydrodynamic pressure inertia force into the body of the dam both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Disposal of extra excavated earth of canals, is utilized to provide a spoil bank on Left side Both sides Right side All listed here Left side Both sides Right side All listed here ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A fall which maintains its depth, is A trapezoidal notch fall All listed here A low weir fall A rectangular notch fall A trapezoidal notch fall All listed here A low weir fall A rectangular notch fall ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A 6 hours storm had 4 cm of rainfall and the resulting runoff was 2 cm. If<="" div=""> 7.5 cm 6.0 cm 9.0 cm 4.5 cm 7.5 cm 6.0 cm 9.0 cm 4.5 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A minimum of 90 cm free board is provided if the discharge in the canal is between Over 60 cumecs 30 to 60 cumecs Over 100 cumecs 30 to 33 cumecs Over 60 cumecs 30 to 60 cumecs Over 100 cumecs 30 to 33 cumecs ANSWER DOWNLOAD EXAMIANS APP