Power Systems To reduce the radio interference which line is/are transposed? Both power and telecommunication lines either 1 or 2 None of these Power line Both power and telecommunication lines either 1 or 2 None of these Power line ANSWER DOWNLOAD EXAMIANS APP
Power Systems Reflection coefficient of voltage is Rv (Zl - Zs)/(Zs + Zl) (Zs - Zl)/(Zs + Zl) 2Zl/(Zs + Zl) 2Zs/(Zs + Zl) (Zl - Zs)/(Zs + Zl) (Zs - Zl)/(Zs + Zl) 2Zl/(Zs + Zl) 2Zs/(Zs + Zl) ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a biased differential relay the bias is defined as the ratio of number of turns of restraining and operating coil. fault current and restraining coil current. fault current and operating coil current. operating coil current and restraining coil current. number of turns of restraining and operating coil. fault current and restraining coil current. fault current and operating coil current. operating coil current and restraining coil current. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What should be the minimum depth (in metre)of cable trench to dug for laying of 1.1 kV? 0.90. 0.75. 1.05. 1.20. 0.90. 0.75. 1.05. 1.20. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following represents the transmission or reflection coefficient of voltage Tv? (Zl = Surge impedance of load, Zs = Surge impedance of line) 2Zs/(Zs + Zl) (Zs - Zl)/(Zs + Zl) (Zl - Zs)/(Zs + Zl) 2Zl/(Zs + Zl) 2Zs/(Zs + Zl) (Zs - Zl)/(Zs + Zl) (Zl - Zs)/(Zs + Zl) 2Zl/(Zs + Zl) ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants can generate power at unpredictable or uncontrollable time Wind turbine. Cooling tower. Condenser. Pulverising unit. Wind turbine. Cooling tower. Condenser. Pulverising unit. ANSWER DOWNLOAD EXAMIANS APP