Power Systems A 4 bus power system consists of 4 transmission lines, then find the sparsity of Y bus matrix? 0.75 0.5 0.25 0.4 0.75 0.5 0.25 0.4 ANSWER DOWNLOAD EXAMIANS APP
Power Systems An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 400/5. The pick up value is 10 A 12.5 A 15 A 6.25 A 10 A 12.5 A 15 A 6.25 A ANSWER DOWNLOAD EXAMIANS APP
Power Systems The incremental fuel costs for two generating units G1 and G2 are given by Ic1 = 25 + 0.2 PG1 and Ic2 = 32 + 0.2 PG2, where PG1 and PG2 are real powers generated by the units. The economic allocation for a total load of 250 MW, neglecting transmission loss, is given by PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 125 MW and PG2 = 125 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The unit protection scheme provides remote protection. simultaneous protection. primary protection. back up protection. remote protection. simultaneous protection. primary protection. back up protection. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The flow duration curve at a given head of a hydroelectric plant is used to determine total power available at the site. total units of energy available. load factory at the plant. diversity factor for the plant. total power available at the site. total units of energy available. load factory at the plant. diversity factor for the plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The line current IR flowing into balanced delta connected load is - j5 - 3 A. If the phase sequence is RYB the phase current IYB is 55.1. 20. 5. 10. 55.1. 20. 5. 10. ANSWER DOWNLOAD EXAMIANS APP