Theoretically calculated diameter of the stripping section of the continuous rectification column is __________ that of the enriching section.

More than
Less than
Either more or less (depending upon relative volatility)
Same as

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
In the design of a shell and tube heat exchanger, the corrosion allowance

For internal cover and tube sheet is provided on both the sides
Need not be provided for non-pressure parts like tie rods, spacers, baffles, supports etc
All of these
For carbon steel and cast iron pressure parts is 1.5 mm (except for tubes) and for severe conditions it is 3 mm

ANSWER DOWNLOAD EXAMIANS APP