Industrial Engineering and Production Management The technique for establishing and maintaining priorities among the various jobs of any project is known as Short interval scheduling Slotting technique for scheduling Critical ratio scheduling Event flow scheduling technique Short interval scheduling Slotting technique for scheduling Critical ratio scheduling Event flow scheduling technique ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following wage incentive plan is applied to all workers? Gantt plan Rowan plan Halsey plan Emerson's efficiency plan Gantt plan Rowan plan Halsey plan Emerson's efficiency plan ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management What does symbol 'V' employ in work study Operation Permanent storage Delay/ temporary Storage Inspection Operation Permanent storage Delay/ temporary Storage Inspection ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Critical path on PERT/CPM chart is obtained by joining the events having Minimum slack Maximum slack Average slack No slack Minimum slack Maximum slack Average slack No slack ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Inventory control in production, planning and control aims at Achieving optimization Discounts allowed in bulk purchase Acceptable customer service at low capital investment in inventory Ensuring against market fluctuations Achieving optimization Discounts allowed in bulk purchase Acceptable customer service at low capital investment in inventory Ensuring against market fluctuations ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The assumption in PERT is A project can be subdivided into a set of predictable, independent activities Cost of project will always be more than the estimated cost, if no timely corrections are taken A project will always be behind schedule, if left uncorrected Activities are fixed and can't be changed A project can be subdivided into a set of predictable, independent activities Cost of project will always be more than the estimated cost, if no timely corrections are taken A project will always be behind schedule, if left uncorrected Activities are fixed and can't be changed ANSWER DOWNLOAD EXAMIANS APP