Industrial Engineering and Production Management The grouping of activities into organizational units is called Functional authority Departmentation Higher level management Corporate plans Functional authority Departmentation Higher level management Corporate plans ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In value engineering, important consideration is given to Customer satisfaction Function concept Profit maximization Cost reduction Customer satisfaction Function concept Profit maximization Cost reduction ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Inventory management consists of State of merchandise methods of storing and maintenance etc. All of these Effective running of stores Stock control system State of merchandise methods of storing and maintenance etc. All of these Effective running of stores Stock control system ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as Taylor Differential Piece rate system Halsey Premium plan Rowan Plan Day work plan Taylor Differential Piece rate system Halsey Premium plan Rowan Plan Day work plan ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following charts are used for plant layout design? Man machine chart Travel chart Operation process chart All of these Man machine chart Travel chart Operation process chart All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The assumption in PERT is A project will always be behind schedule, if left uncorrected Cost of project will always be more than the estimated cost, if no timely corrections are taken A project can be subdivided into a set of predictable, independent activities Activities are fixed and can't be changed A project will always be behind schedule, if left uncorrected Cost of project will always be more than the estimated cost, if no timely corrections are taken A project can be subdivided into a set of predictable, independent activities Activities are fixed and can't be changed ANSWER DOWNLOAD EXAMIANS APP