System Analysis and Design The systems conversion technique of totally removing the existing system and immediately implementing the new system is called as parallel run pilot conversion None of these phased conversion crash conversion parallel run pilot conversion None of these phased conversion crash conversion ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design A branch office, location or other data processing centres, where a newly developed system is used under normal operating conditions for several months, to test it, is called beta test data system test data string test data alpha test data beta test data system test data string test data alpha test data ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Coding and testing are done in which manner. bottom-up top-down None of these cross-sectional ad hoc bottom-up top-down None of these cross-sectional ad hoc ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design When desk-checking an algorithm, you should set up a table that contains _____. Both a and b One column for each output item One column for each processing item a, b, and c One column for each input item Both a and b One column for each output item One column for each processing item a, b, and c One column for each input item ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Which of the following is (are) the characteristic(s) of a system? Interdependence All of these Interaction organization None of these Interdependence All of these Interaction organization None of these ANSWER DOWNLOAD EXAMIANS APP
System Analysis and Design Programmers refer to the items needed to reach a problem's goal as the _____ Out put Processing None of these Purpose Input Out put Processing None of these Purpose Input ANSWER DOWNLOAD EXAMIANS APP