Surveying The sidereal day is the time interval between two successive upper transits of First point of Aries Mean sun The polar star First point of Libra First point of Aries Mean sun The polar star First point of Libra ANSWER DOWNLOAD EXAMIANS APP
Surveying The maximum tolerance in a 20 m chain is ±5 mm ±8 mm ±3 mm ±2 mm ±5 mm ±8 mm ±3 mm ±2 mm ANSWER DOWNLOAD EXAMIANS APP
Surveying For plane ground the scale of a vertical photograph will be same as that of a tiled photograph along the photo parallel through Plumb point Principal point Isocenter None of these Plumb point Principal point Isocenter None of these ANSWER DOWNLOAD EXAMIANS APP
Surveying Check lines (or proof lines) in Chain Surveying, are essentially required To increase the out-turn To indicate the accuracy of the survey work To plot the chain lines To plot the offsets To increase the out-turn To indicate the accuracy of the survey work To plot the chain lines To plot the offsets ANSWER DOWNLOAD EXAMIANS APP
Surveying Latitude of a place is the angular distance from Greenwich to the place Equator to the nearer pole Equator to the poles None of these Greenwich to the place Equator to the nearer pole Equator to the poles None of these ANSWER DOWNLOAD EXAMIANS APP
Surveying The altitudes of a circumpolar star at culminations are 70° and 10°, both culminations being north of zenith. The declination of the star, is 70° 50° 60° 80° 70° 50° 60° 80° ANSWER DOWNLOAD EXAMIANS APP