Surveying After fixing the plane table to the tripod, the main operations which are needed at each plane table station are (i) Levelling (ii) Orientation (iii) CenteringThe correct sequence of these operations is (i), (iii), (ii) (ii), (iii), (i) (iii), (i), (ii) (i), (ii), (iii) (i), (iii), (ii) (ii), (iii), (i) (iii), (i), (ii) (i), (ii), (iii) ANSWER DOWNLOAD EXAMIANS APP
Surveying The difference in longitude of two places expressed in time is equal to the difference in their All listed here Mean solar time Sidereal time Apparent solar time All listed here Mean solar time Sidereal time Apparent solar time ANSWER DOWNLOAD EXAMIANS APP
Surveying The true and mean suns occupy the same meridian at the same time on September 1 June 14 April 15 All of these September 1 June 14 April 15 All of these ANSWER DOWNLOAD EXAMIANS APP
Surveying The station which is selected close to the main triangulation station, to avoid intervening obstruction, is not known as Eccentric station Pivot station False station Satellite station Eccentric station Pivot station False station Satellite station ANSWER DOWNLOAD EXAMIANS APP
Surveying The principal line is the line joining the principal point and None of these Perspective centre Isocenter Nadir None of these Perspective centre Isocenter Nadir ANSWER DOWNLOAD EXAMIANS APP
Surveying The scale of a tilted photograph of focal length f, taken from an altitude H, along the plate parallel through plumb point, is f sec θ/H f/H f/H sec θ f/H cos ½θ f sec θ/H f/H f/H sec θ f/H cos ½θ ANSWER DOWNLOAD EXAMIANS APP