Surveying After fixing the plane table to the tripod, the main operations which are needed at each plane table station are (i) Levelling (ii) Orientation (iii) CenteringThe correct sequence of these operations is (ii), (iii), (i) (i), (iii), (ii) (iii), (i), (ii) (i), (ii), (iii) (ii), (iii), (i) (i), (iii), (ii) (iii), (i), (ii) (i), (ii), (iii) ANSWER DOWNLOAD EXAMIANS APP
Surveying The negative sign is assigned to Correction for horizontal alignment All listed here Reduction to mean sea level Correction for slope Correction for horizontal alignment All listed here Reduction to mean sea level Correction for slope ANSWER DOWNLOAD EXAMIANS APP
Surveying The slotted template method Is prepared, by graphical method Is suitable for large areas with less control All listed here Is rapid and accurate Is prepared, by graphical method Is suitable for large areas with less control All listed here Is rapid and accurate ANSWER DOWNLOAD EXAMIANS APP
Surveying If θ and δ be the latitude of a place and declination of a star respectively, the upper culmination of the star will be north of zenith if its zenith distance, is δ - θ (θ + δ)/2 θ + δ θ - δ δ - θ (θ + δ)/2 θ + δ θ - δ ANSWER DOWNLOAD EXAMIANS APP
Surveying The suitable contour interval for a map with scale 1 : 10000 is 5 m 2 m 20 m 10 m 5 m 2 m 20 m 10 m ANSWER DOWNLOAD EXAMIANS APP
Surveying The position of a heavenly body on the celestial sphere can be completely specified by Its declination and right ascension All listed here Its altitude and azimuth Its declination and hour angle Its declination and right ascension All listed here Its altitude and azimuth Its declination and hour angle ANSWER DOWNLOAD EXAMIANS APP