Irrigation Engineering The ratio of the head recovered to the head put in, is known as Modular limit Efficiency Flexibility Sensitivity Modular limit Efficiency Flexibility Sensitivity ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A river training work is generally required when the river is Meandering All of these Aggrading Degrading Meandering All of these Aggrading Degrading ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The net head under which the turbine reaches its peak efficiency at synchronous speed is called rated head design head operating head gross head rated head design head operating head gross head ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be 30 m3/sec 35 m3/sec 25 m3/sec 20 m3/sec 30 m3/sec 35 m3/sec 25 m3/sec 20 m3/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct statement from the following answer All of these If the flexibility is more than one, the outlet is hyper-proportional If the flexibility is zero, it is a rigid module If the setting of an outlet is higher than that required for proportionality, the outlet is hyperproportional All of these If the flexibility is more than one, the outlet is hyper-proportional If the flexibility is zero, it is a rigid module If the setting of an outlet is higher than that required for proportionality, the outlet is hyperproportional ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Borrow pits should preferably be located in Field on the right side of the canal Central half width of the section of the canal Fields on both sides of the canal Field on the left side of the canal Field on the right side of the canal Central half width of the section of the canal Fields on both sides of the canal Field on the left side of the canal ANSWER DOWNLOAD EXAMIANS APP