Irrigation Engineering A hydroelectric scheme operating under a head of 80 m will be classified as high head scheme None of these medium head scheme low head scheme high head scheme None of these medium head scheme low head scheme ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The maximum permissible eccentricity for no tension at the base of a gravity dam is B/2 B/4 B/3 B/6 B/2 B/4 B/3 B/6 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following canal structures is used to remove surplus water from an irrigation channel into a natural drain ? canal fall canal regulator canal escape canal outlet canal fall canal regulator canal escape canal outlet ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The downstream expansion head of a guide bank is extended to subtend an angle at the centre, equal to 45° 60° 90° 30° 45° 60° 90° 30° ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering As compared to gravity dams, earthen dams require sound rock foundations are costlier are less susceptible to failure require less skilled labour require sound rock foundations are costlier are less susceptible to failure require less skilled labour ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The maximum average depth due to one day storm over an area of 100 km2 is 100 mm. Depth-Area-Duration (DAD) curves indicate that for the same area of 100 km2 the maximum average depth for a 3 hour storm will be None of these 100 mm less than 100 mm more than 100 mm None of these 100 mm less than 100 mm more than 100 mm ANSWER DOWNLOAD EXAMIANS APP