Irrigation Engineering If the demand line drawn from a ridge in a flow mass curve does not intersect the curve again, it indicates that demand cannot be met by inflow reservoir was not full at the beginning both (A) and (B) None of these demand cannot be met by inflow reservoir was not full at the beginning both (A) and (B) None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the height of the hydraulic gradient line above the floor of thickness t is h and the specific gravity of the material of the floor is G, the minimum thickness t of the floor downstream of the crest-wall, is given by the equation t = (h + 1)/(G + t) t = (h + 1)/G t = (h - 1)/(G - t) t = (h - 1)/(G + t) t = (h + 1)/(G + t) t = (h + 1)/G t = (h - 1)/(G - t) t = (h - 1)/(G + t) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The minimum size of stone that will remain at rest in a channel of longitudinal slope S and hydraulic mean depth R is given by 7RS 15 RS 11RS 4RS 7RS 15 RS 11RS 4RS ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The flow of water after spilling over the weir crest in chute spillway and side channel spillway respectively are Parallel to weir crest in both At right angle and parallel to weir crest Parallel and at right angle to weir crest At right angle to weir crest in both Parallel to weir crest in both At right angle and parallel to weir crest Parallel and at right angle to weir crest At right angle to weir crest in both ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a syphon aqueduct Canal passes over the drainage and H.F.L. of the drainage is above the bottom of the canal trough Drainage passes over the canal and F.S.L. of the canal is below the bottom of the drainage trough Drainage passes over the canal and F.S.L. of the canal is above the bottom of the drainage trough Canal passes over the drainage and H.F.L. of the drainage is below the bottom of the canal trough Canal passes over the drainage and H.F.L. of the drainage is above the bottom of the canal trough Drainage passes over the canal and F.S.L. of the canal is below the bottom of the drainage trough Drainage passes over the canal and F.S.L. of the canal is above the bottom of the drainage trough Canal passes over the drainage and H.F.L. of the drainage is below the bottom of the canal trough ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A multipurpose reservoir is the one which is None of these designed for one purpose but serves more than one purpose both (A) and (B) planned and constructed to serve various purposes None of these designed for one purpose but serves more than one purpose both (A) and (B) planned and constructed to serve various purposes ANSWER DOWNLOAD EXAMIANS APP